Modernization of a Steam Capper
Succes stories | 2026-08-05

Mandate
The scope of this project was part of an overall modernization initiative aimed at improving the reliability and long-term sustainability of the equipment. This included upgrading existing systems, reconstructing previously unavailable technical documentation, and preparing the installation for safe and efficient long-term operation.
Task performed
o Ensure project follow-up and coordination with the client throughout the work
o Supervise the electrical contractor’s activities to ensure the quality of the work performed
o Conduct risk analysis and define safety functions using functional descriptions and appropriate diagrams
o Upgrade the machine to ensure compliance with current standards
o Implement safety protocols and prepare the required validation reports
o Develop network and electrical plans required for the integration of modernized systems
o Perform PLC / MHI programming and programming and integration to ensure control of the modernized machine
o Program safety functions in accordance with operational and regulatory requirements
Tools and methods used
o Electrical : SEE Electrical
o PLC Allen Bradley : Studio 5000